References

EA Dykker Service ApS has extensive experience in the renovation of concrete, the company has repeatedly over the last 30 years renovated concrete structures after damage from ferries and the like.

In addition, the company has several times made more concrete renovations that we can mention the following work:

  • 1979-81: Construction of Alssundbroen, mainly concrete and spunsarbejde (6 divers). The work carried out for SKANSKA.
  • 1987: Pressure washing of concrete and inspection of bridge piers on Sallingsundbroen the Road Directorate (4 divers).
  • 1992-94: Pressure washing and concrete repairs on West Bridge (4 divers). The work performed Brokonsortiet.
  • 1994: Control of concrete in bridge piers, etc. in connection with the submission of West Bridge for Great Belt A / S (4 divers).
  • 1995-96: Renovation of Vildsund bridge flap pill, blasting and high pressure hoses made of concrete, loading 40 tons of new armor and casting (7 divers). The work performed Per Aarsleff A/S.
  • 2001: Pressure washing and reinforcement, casting 517 meters berth at Langelinie in Copenhagen Dive Construction, (4 divers).
  • 2001: Concrete Repair, including iboring of several adhesive anchors, installation of new armor and casting after damage from Peter Vessel, Frederikshavn harbor for MT Højgaard A/S.
  • 2001-02: Port of Aarhus, the new port expansion. Upper and lower anchor bolts, assembly of molds for Cast concrete and installation of anodes (up to 8 divers). The work performed Per Aarsleff A/S.
  • 2002: Port of Aarhus, ferry berths to Molslinien. Welding the bottom formwork for autofortøjning, casting to bottom protection (about 1200 m3) and installation of anodes. (4 divers). The work performed Per Aarsleff A/S.
  • 2002: Port of Hirtshals. New container quay, welding and installation of brackets for casting hammer. (4 divers). The work performed
    Per Aarsleff A/S.
  • 2002: Grouting of pipe poles on the switchyard at Horns Rev for Densit, Aalborg (5 divers).
  • 2002: Diving Inspection of spudcan, including high pressure hoses of welds with 2500 bar and ultrasound measurements of welds on the drilling rig Maersk Endeavour, ibsen field for Maersk Contractors, Esbjerg (6 divers).
  • 2002: Execution of different diving operations for A2SEA, Fredericia at Horns Rev, (5 divers).
  • 2002: Diving Inspection of spudcan, including high pressure hoses and ultrasound measurements of welds on oil rig Self Explorer, Esbjerg
    (5 divers).
  • 2002: Port of Aarhus. Bottom lock. Pouring approx. 800 m3. (4 divers). The work performed for MT Højgaard A/S.
  • 2002: Port of Aarhus. Repair of 3 damage to concrete sheet piles. Reinforcement, formwork, concrete casting.
  • 2008: Horns Rev 2 Vindmøllepark, 2008 - 2009 Aarsleff / Bilfinger Berger- Joint Venture
  • 2009: Rødsand 2 2009 - 2010 Vindmøllepark, Aarsleff / Bilfinger
    Berger - Joint Ventura
  • 2009: Sprogø 2009 Vindmøllepark, Aarsleff / Bilfinger Berger - Joint Venture
  • 2010: Fehmarnbelt Fixed Link, 2010 - 2011 - 2012 - 2013 Per Aarsleff A/S
  • 2011: Anholt Vindmøllepark 2011 Peter Madsen Rederi A/S
  • 2012: Inspektion af gasledninger i Storebælt for Energinet.dk
  • 2013: Multimediehuset Aarhus havn 2013 - 2014 Per Aarsleff A/S
  • 2014: Havmølleparken Dan Tysk 2014 Per Aarsleff A/S
  • 2014-2016: JV Värtahamnen HB Stockholm Sverige 2014 - 2015
    Per Aarsleff A/S
  • 2016: Anstødsfenter ved Sallingsundbroen. Arbejdet udført for
    Per Aarsleff A/S.
  • 2016: Kalundborg havn over 1700 anoder monteret. Arbejdet udført for Kalundborg havn.
  • 2017: Krydstogtskaj i Visby på Gotland, Sverige. Arbejdet udført for
    Per Aarsleff A/S.
  • 2017: Esbjerg havn montering af ca. 700 anoder. Arbejdet udført for Esbjerg havn.